The basin before restoration.
The basin immediately below the lock before lock restoration started. The tree growth in the middle of the canal is growing on the bund placed there during the restoration of the basin under an environmental scheme mainly funded by an ERDF Grant in 2001.

Showing image 5 of 24 in this gallery category
>> Return to Tonna Lock Restoration gallery photographs
The latest photographs are also available as an RSS feed.