Neath and Tennant Canals Trust

Affiliated to the Inland Waterways

05 February 2012

Arrival of the crane and lock gates at Resolven Basin

The crane with jib extended prepares to lift gates into the lock chamberf.

Go to next image of the set Go to last image of the set Show full size image  (image 1 of 37)

Arrival of the crane and lock gates at Resolven Basin

Showing image 1 of 37 in this gallery category

>> Return to Renewal of lock gates at Resolven gallery photographs

RSS The latest photographs are also available as an RSS feed.


Go to the Home Page     View page in Print Format Email Page to a Friend