Installation of top gate
Top gate being lifted into position. The red trailor and tractor on the towpath, used to deliver the gates to the site. The old concrete and stone walling alongside the lock is to be rebuilt at a later date.

Showing image 14 of 24 in this gallery category
>> Return to Tonna Lock Restoration gallery photographs
The latest photographs are also available as an RSS feed.