Neath and Tennant Canals Trust

Affiliated to the Inland Waterways

05 February 2012

Installation of top gate

Top gate being lifted into position. The red trailor and tractor on the towpath, used to deliver the gates to the site. The old concrete and stone walling alongside the lock is to be rebuilt at a later date.

Go to first image of the set Go to previous image of the set  Go to next image of the set Go to last image of the set Show full size image  (image 14 of 24)

Installation of top gate

Showing image 14 of 24 in this gallery category

>> Return to Tonna Lock Restoration gallery photographs

RSS The latest photographs are also available as an RSS feed.


Go to the Home Page     View page in Print Format Email Page to a Friend